CHALKODONIO (33.60MW)
Year: 2022
Client: EDPR HELLAS SA
Airenergy: Construction
Project Info:
- 7 WTGs Nordex N-149 4.8MW
- 6 km internal network
- 7 km of interconnection line
- 129.000 m3 excavations
- 84.000 m3 embankments