DESFINA (82.25MW)
Year: 2018-2020
Client: ENERCON GmbH
Airenergy: Construction
Project Info:
- 35 WTGs (7 ENERCON E82 2.35MW and 28 ENERCON E92 2.35MW)
- 60km road construction works (45km new roads & 15km improvement of existing roads)
- Construction of crane platforms and assembly areas
- Construction of 7 foundations for ENERCON E82/S/77/5K/01 and 28 ENERCON E92/S/77/5K/01 Wind Turbines
- Complete construction of internal cable network
- Construction of Overhead High Voltage Line 150kV
- Construction of High Voltage Substation (37 HV Line Pylons)
- 392.800 m3 excavations
- 272.000 m3 embankments
- 201 Tubular Culverts