LIVAS (2.40MW)
Year: 2021
Ownership: DYTIKOS ANEMOS ZAKYNTHOS S.A.
AirEnergy: PROJECT CONSTRUCTION SUPERVISION
Project information:
Wind turbines: three (3) ENERCON E-53, 800KW each
Energy Efficiency Improvement of existing forest road 290m.
290m of new forest road.
Formation of storm water drainage ditches along the road
Formation of three (3) plazas for the erection of wind turbines
Excavation of the foundations of three (3) wind turbine squares
Construction of the grounding network for the wind turbine construction squares
Medium-voltage cable interconnection network
Construction of a control house