LIVAS

LIVAS

LIVAS (2.40MW)

Year: 2021

Ownership: DYTIKOS ANEMOS ZAKYNTHOS S.A.

AirEnergy: PROJECT CONSTRUCTION SUPERVISION

Project information:

Wind turbines: three (3) ENERCON E-53, 800KW each

Energy Efficiency Improvement of existing forest road 290m.

290m of new forest road.

Formation of storm water drainage ditches along the road

Formation of three (3) plazas for the erection of wind turbines

Excavation of the foundations of three (3) wind turbine squares

Construction of the grounding network for the wind turbine construction squares

Medium-voltage cable interconnection network

Construction of a control house

Photo3.jpgPhoto4.jpgPhoto5.jpgPhoto6.jpgPhoto7.jpgPhoto1.jpgPhoto2.jpg

PROJECT SPECIFICATIONS

  • Location: Livas - Zakynthos
  • Latitude: 37.829701
  • Longitude: 20.724580
  • Status: Operational
  • Total Capacity: 2,4 MW
  • AirEnergy: Construction