MACRYCHORIA (24.05MW)
Year: 2023 - 2024
Client: GREENVOLT
Project Info:
EPC contract for PV station with all required equipment & accompanying works
(civil, mechanical, electrical)
-Soil clearance & light cut/fill earthworks
-External & internal road network for heavy duty
- MV substations concrete base & platforms
- 250.000m DC cabling
- 46.000m ACLV cabling
- 8.000m ACMV cabling
- Earthing & lightning protection system
- 24,052MW of steel structures in inclined E-W soil (up to 30%)
- Predrilled pile foundation system with concrete
- 15.000m of trenches
- CCTV & SCADA system
- 5.000m of fence & gates
- 44.000 Solar Panels Type Longi 545-550 Bifacial
- 74 x 350kW Inverters Sungrow SG350HX
- 2 x MV substations Sungrow MVS8960LV
- 1 x MV substation Sungrow MVS6400L